Skip Ribbon Commands
Skip to main content
Home

HIGHER EDUCATION PROJECTS

​​​
 

 UCF Parking Lots

 
​​​​Road Repurposing to Add Additional Parking, Orlando, FL 

The purpose of this project was to utilize an existing and no longer necessary road to accommodate parking for the growing campus. HCI provided all labor, material, equipment, coordination and necessary supervision in providing: Additional curbs and gutters, installation of irrigation lines, relocation of driveways, paving, striping, sidewalks and landscaping. Also included drainage modifications.

 

 UCF Student Union Subway Restaurant

 
HVAC Upgrades, Orlando, FL

Replaced the existing 17-year-old chilled water Air Handling Unit with a new unit of significantly higher cooling capacity. The work included the demolition of the existing unit and associated ductwork and piping and replacement with a new 10-ton AHU, ductwork and piping. ​

 
 

 Auburn - Davis Aerospace Engineering Center

 
Flooring Installation, Auburn, AL
1411605000_Au_Davis.jpg
Installation of modular carpet tiles on the second and third floors of Davis Aerospace Engineering Center at Auburn University's main campus.